BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Intand Corporation//Tandem//EN
METHOD:PUBLISH
BEGIN:VEVENT
DTSTAMP:20260514T053859Z
DTSTART:20201124T000000Z
DTEND:20201124T003000Z
TRANSP:TRANSPARENT
PRIORITY:0
SUMMARY:Connecting to Place Campaign Construction Kick-off Celebration
LOCATION:Bush Seattle Campus > Upper Campus > Gracemont
DESCRIPTION:This is a celebratory event marking the start of construction 
 for the new upper school buidling.  Format will be similar to Convocation 
 with most if not all presentations by HOS and others streamed live from th
 e construction site to virtual attendees.  There may be a video or slidesh
 ow portion.  \n\nGroups:\nSEA Head of School\nSEA Development\n\nSchools:\
 nThe Bush School - Seattle\n\nLocation:\nBush Seattle Campus > Upper Campu
 s > Gracemont\n\nLive streaming setup with HDMI to twisted pair for camera
  on level 2 of Gmont\, with main setup in Sun Room of Gmont.\n\n
X-ALT-DESC;FMTTYPE=text/html:<!doctype html><html><body>This is a celebrat
 ory event marking the start of construction for the new upper school buidl
 ing.  <span>Format will be similar to Convocation with most if not all pre
 sentations by HOS and others streamed live </span>from the construction si
 te to virtual attendees.  There may be a video or slideshow portion.  <br 
 /><br />Groups:<br />SEA Head of School<br />SEA Development<br /><br />Sc
 hools:<br />The Bush School - Seattle<br /><br />Location:<br />Bush Seatt
 le Campus > Upper Campus > Gracemont<br /><br />Notes:<br />Live streaming
  setup with HDMI to twisted pair for camera on level 2 of Gmont\, with mai
 n setup in Sun Room of Gmont.<br /></body></html>
URL;VALUE=URI:http://bush.tandem.co/index.php?type=view&action=event&id=26
 527
CREATED:20201020T171607Z
LAST-MODIFIED:20201120T233925Z
UID:event_request-26527-bush@intand.com
END:VEVENT
END:VCALENDAR
